Instructor by: Cecep Slamet Abadi, ST
24 – 26 Juni 2014, New Saphir Hotel, Yogyakarta
19 – 22 Mei 2014, Jogjakarta Plaza Hotel, Yogyakarta OVERVIEW Periodically, all industrial equipment including turbines require a major overhaul. The level of work required for repairs will depend a lot on the operating conditions such as fuel quality, combustion air and how the unit is loaded. Improvement in order to run smoothly and to complete all necessary work, planning should begin long before repairs begin. OUTLINE A. Introduction B. Preparation- Maintenance records
- Inspection
- Drawings
- Lifting devices and rigging
- Scheduling
- Procurement of equipment and supplies
- Hystory
- Other Turbine in the Plant
- Turbine Workscope
- Disassembly
- Summary of Internal Damage Found
- Casing and Diaphragm Damage
- Casing Repair
- Problem With Boring the Case
- Diaphragm Repair
- Diaphragm Splitline Repairs
- Diaphragm Sealing Surface Repairs
- Nozzle Box Repair
- Rotor Repair
- Spare Rotor Repair
- Seal rings
- Facing plates
- Wicket gate bushing line boring
- Redoweling
- Torque or stretch of bolts
- Unit alignment
- Wicket gate adjustment
- Gaskets and packing
- Governor
- Borescope Inspection Inspections
- Final Inspection
- Initial Startup
- Operational Reading
- Vibration Monitoring
- Efficiency Meassurement and Power Loss
Formulir Pendaftaran
Silahkan isi FORMULIR PENDAFTARAN berikut dengan data yang benar agar
Kami dapat konfirmasi ulang kembali via email, WA maupun telepon.
HUBUNGI KAMI
Komplek Pertokoan Ruko Tritunggal No. T7, Jotawang, Bantul, Yogyakarta 55188
Phone : 0811 2949 265
Email : marketing1@cakrabiwa.co.id