Dilihat 824
- All aspects of completions are covered in sufficient detail to permit participants to review his/her current practices
- The fundamental concepts of production operations and their proper application in the field
- Production equipment such as wellhead, tubing and packers, well completions and workover as well as well test and problems, production logging and cementing will also covered
- Production logs and how and when to use them; evaluation techniques for cement bond logs and pulse echo tools
- Learn how to plan and implement well completions, workovers, stimulation treatments, and routine production operations with an efficiency that increases profits
- Learn about the role of rock mechanics in completions, stimulation, and workovers
- Be able to give suggest or discover the procedures and techniques that increase production and cut operating costs
- Be Able to identify and implement production improvement opportunities that can be carried out by either rig or non-rig well interventions
- Implementation of appropriate technology, either from internal or external sources, in well design, whilst ensuring that the well value is maximised
- The Nature of Rocks and Fluids
- Porosity and Permeability
- Productivity Index
- Volumetric Calculation
- Other Calculations and Decline Curves
- Well Productivity
- Choke opening strategy to avoid water conning
- Inflow and Outflow
- Well head and Well Head Equipment
- Multiple Orifice
- Routine Operations
- Opening and Shut-in Well Procedure
- Test Separator Operations and Equipments
- Gas Systems Instruments
- Flare System and Depressurising
- Pigging Techniques and Procedures
- Sampling and Analysis
- BS & W and API Gravity Measurement
- Protective Steam Tracing
- Process, Level, Temperature and Pressure Controls
- Oil treating , Heater treater and Dehydrator
- Separators, Stage Separators and Sizing
- Two-phase and Three-phase Separation
- Skimmer tank and Flotation unit
- Low Production and Formation Damage
- Low Reservoir
- Plug-in Tubing or Perforations
- High Viscosity
- High Back Pressure
- Inadequate Artificial Lift
- Water Production and Mechanical Problem
- Protective Steam Tracing
- Gravel Pack, Resin and Fraspac
- Chemical analysis
- Precipitation Mechanism
- The wax and Paraffin Problems
- Emulsion Built-up and Emulsifying Agent
- Sampling and Analysis
- Emulsion Treating
- Heat and Chemical Treatment
- Electrostatic Coalescing
- Scale Composition, Prediction and Identification
- Mechanic and Chemical methods
- Scale Prevention and Inhibitors
- Basic Theory
- Detection and Measurement
- Prevention and Material Used
- Coating and Chemicals
- Cathodic Protections and inhibitors
- Production, Operations, Facilities and Senior Petroleum Engineers
- Surface Equipment Technicians, Technical or Reservoir Engineers
- Supervisory Personnel who interact with field facility engineers/operators
- Production Managers and Field Production Supervisors
- Engineers and other personnel involved with the daily operation and management of producing oil and gas wells.
Formulir Pendaftaran
Silahkan isi FORMULIR PENDAFTARAN berikut dengan data yang benar agar
Kami dapat konfirmasi ulang kembali via email, WA maupun telepon.
HUBUNGI KAMI
Komplek Pertokoan Ruko Tritunggal No. T7, Jotawang, Bantul, Yogyakarta 55188
Phone : 0811 2949 265
Email : marketing1@cakrabiwa.co.id
