- Defining boundary system to be assessed
- Screening operating unit within a plant to identify area of high risk.
- Identifying the damage mechanism operative
- Determining the technical module sub-factor and likelihood of failures
- Determining the hazard areas and consequence of failure
- Estimating a risk value of each equipment, tabulated and ranked
- Prioritizing the equipment maintenance based on a the measured risk
- Designing an appropriate inspection program.
- Systematically managing the risk equipment failures
- Increased knowledge of equipment which may pose a potential risk
- More reliable equipment and plant operation
- Increased safety
- Cost optimization through switching to non-invasive inspection techniques
- Possibility to tailor shutdown scope
- Option to extend run lengths where applicable national regulations permit it
- Increased teamwork during the implementation process
- Development of a knowledge database including equipment design, process features, damage mechanisms and inspection strategies
Formulir Pendaftaran
Silahkan isi FORMULIR PENDAFTARAN berikut dengan data yang benar agar
Kami dapat konfirmasi ulang kembali via email, WA maupun telepon.
HUBUNGI KAMI
Komplek Pertokoan Ruko Tritunggal No. T7, Jotawang, Bantul, Yogyakarta 55188
Phone : 0811 2949 265
Email : marketing1@cakrabiwa.co.id