Dilihat 328
MATERI
- Fundamentals of production leveling
- Production leveling
- Introduction to simulation : how to determine the model and to use Heijunkaboard for the control in manufacturing
- Calculate the number of Kanban cards
- Calculate the amount of inventories in supermarket
- Simulation with two stage system with Kanban principles and supermarkets : disturbance, large orders, Make-To-Stock/Make-To-Order, determining control limits, handling changes in demand
- Aspects must be given particular attention by managers, how to achieve success in introducing the methods
Form Pendaftaran
Silahkan isi FORMULIR PENDAFTARAN berikut dengan data yang benar agar Kami dapat konfirmasi ulang kembali via email, WA maupun telepon.