
Dilihat 530
- Overview Power System Management Pembangkit PLTGU
- PLTGU Power System Standards & Regulation
- Pengoperasian Instalasi PLTGU
- Operating Procedure/SOP Unit Pembangkit
- Unit Pengatur Beban
- Sistem Kontrol
- Turbin & Alat Bantu
- Kompresor Utama & Alat Bantu
- Alternator & Eksiter
- Trafo Tenaga & Pemutus Tenaga
- Sistem Bahan Bakar Minyak
- Sistem Bahan Bakar Gas
- Sistem Air Pendingin
- Sistem Udara Atomisasi (Pengabut)
- Alarm & Gangguan
- Sistem Pengaman Proteksi PLTGU
- Pengaman Turbin Gas
- Pengaman Generator
- Sistem Pemadam Kebakaran
- Prosedur Start Turbin Gas
- Skema Untuk Start & Stop Turbin Gas
- Pembebanan & Pengontrolan Pembatas Beban
- Peyetopan Unit
- Sistem Transfer Bahan Bakar
- Pemeriksaan Saat Operasi
- Pengendalian Putaran
- Sistem Interlok Unit
- Block Coordination Level Control
- Group Level Control
- Individual Drive Level Control
- BCC (Block Coordination Controller)
- APS (Automatic Plant Start Up/Shut Down)
- Break Point
- Prosedur Block Start Up
- Cold Start (Start Dingin)
- Warm Start (Start Hangat)
- Hot Start (Start Panas)
Formulir Pendaftaran
Silahkan isi FORMULIR PENDAFTARAN berikut dengan data yang benar agar
Kami dapat konfirmasi ulang kembali via email, WA maupun telepon.
HUBUNGI KAMI
Komplek Pertokoan Ruko Tritunggal No. T7, Jotawang, Bantul, Yogyakarta 55188
Phone : 0811 2949 265
Email : marketing1@cakrabiwa.co.id
