Dilihat 1023
- Aggregate Planning (AP)
- Master Production Schedule (MPS)
- Rough Capacity Planning (RCP)
- Capacity Requirement Planning (CRP)
- Material Requirement Planning (MRP)
- Symtom of Poor Inventory Management
- Ways to Reduce Inventory Levels
- Inventory Analysis-ABC Analysis
- Performance Control Management
- Key Performance Indicator
- Soil Variability and Fertility Management
- Pest Measurement and Management
- Irrigation System and Control Unit
Formulir Pendaftaran
Silahkan isi FORMULIR PENDAFTARAN berikut dengan data yang benar agar
Kami dapat konfirmasi ulang kembali via email, WA maupun telepon.
HUBUNGI KAMI
Komplek Pertokoan Ruko Tritunggal No. T7, Jotawang, Bantul, Yogyakarta 55188
Phone : 0811 2949 265
Email : marketing1@cakrabiwa.co.id
