Pendaftaran
Cakra Biwa Consultant

Crude Oil Pipeline and Storage Handling

Dilihat 836
Cakra Biwa Consultant
Instructor by : I Nengah Diasta BACKGROUND Crude Oil is produced from the reservoirs pass through well head at the surface and then collected at the Block Station for separation of Oil, Gas and Water. After from Block Station or Gathering Station Crude Oil will be transferred by pipe line to the Mine Oil Storage or Terminal. At the Mine Oil Storage or Terminal production from all field collected together then transferred to Refinery, Domestic or Export. The philosophy and procedure for crude oil processing, transporting and storage handling are: Safety, Minimized losses and pollutions, No changing the quality and avoid contamination. In the other hand many companies carry out its product by joining with transporter, where has been established the pipeline system for transfer to the refinery or Terminal. This course is also thoughtful study how to transfer crude oil joining with Pipeline Transporter, cooperation with other companies in the Joining Pipeline Agreement. Therefore this course will focus to explain and discussed how to handling “Production Operation”, “Crude Oil Pipe line Transportation”, “Crude Oil Storage”, “Lifting Procedure”, “Off take Procedure and Nomination”. OBJECTIVE After this course the participant will be able to: PARTICIPANT This course is recommended to the employees who are working at Block Station, Gathering Station, Pipeline Operation, Mine Oil Storage and Crude Oil Terminal, Crude Oil Accounting and Member of Shipping Coordination. COURSE OUTLINE 1. Crude Oil Production Operation Production collecting system at the Block Station, Manifold and header, Block Station, Gathering Station or satellite. 2. Production Separation and Stabilization Objectives of separation, type and equipment inside Separator, Stabilities principle, Stabilizations with reduced the pressure and stabilization with distillation type. 3. Crude Oil Transportation by Pipe Line Equipment of pipeline system, Pumping, Combine Pumping, pumping type selection. Transportation of Low Pour Point crude oil by heating or suspension system. 4.Storage Handling, Lifting and Crude Oil Measurement 5. Crude oil storage type of storage tank and accessories. 6. Procedure measurement and calculation of crude oil in the storage tank (static measurement) consist of: Level and temperature measurement of fluid in the storage tank, Crude Oil Sample taking from inside the tank, Laboratory analysis to determine of Density/Specific Gravity/API Gravity and BS&W content of the Crude Oil. 7. Crude Oil Stock Calculation consists of: Step of Crude Oil Stock Calculation, Reading of Tank Table, and Reading of ASTM–IP Table. 8. Measurement and calculation Procedure of crude By Flow Meter consist of: Explanation working system of Flow Meter, Procedure of proving and calculation the Metering System by Proper Meter. 9. “Lifting Procedure”, “Off take Procedure and Nomination”. TRAINING METHOD Presentation Discussion Case Study Evaluation   FACILITY Training Kit Handout Certificate Lunch + 2 X Coffee Break Souvenir Pick up participants  
Form Pendaftaran pelatihan di cakra

Formulir Pendaftaran

Silahkan isi FORMULIR PENDAFTARAN berikut dengan data yang benar agar
Kami dapat konfirmasi ulang kembali via email, WA maupun telepon.

Form Data Personal

Personal Data

*Harus diisi

Form Data Materi Training

Data Materi Training

*Harus diisi

Form Data Materi 2 Training

Pastikan data yang diisi sudah benar agar Kami konfirmasi ulang kembali via email, WA maupun telepon terimakasih.

HUBUNGI KAMI

Komplek Pertokoan Ruko Tritunggal No. T7, Jotawang, Bantul, Yogyakarta 55188

Phone : 0811 2949 265